Money
The parking profit formula, without the guesswork
A parking lot earns from the fee and pays for the barriers. That is the whole model, and it is enough to see why an empty lot loses money and why a full lot can be too cheap.

A worked example
Twenty bays, 70% average occupancy, a 60-minute average stay and a $0.47 fee:
| Line | Number |
|---|---|
| Cars served per day | 20 × 0.70 × (900 ÷ 60) = 210 |
| Charge per car | floor(60 × $0.47) = $28 |
| Daily gross | 210 × $28 = $5,880 |
| Daily upkeep | 2 barriers × $400 = $800 |
| Daily net | $5,080 |
| Build cost (bays + barriers) | $2,600 |
| Payback | about half a game day |
The exact cents would make $5,922. The barrier charges whole dollars, so it keeps $42. That difference is small here, but at a higher fee or a shorter stay the missing cents are a larger share of the total.
Why occupancy is the number to watch
| Occupancy | Cars/day | Gross/day | Net/day |
|---|---|---|---|
| 30% | 90 | $2,520 | $1,720 |
| 50% | 150 | $4,200 | $3,400 |
| 70% | 210 | $5,880 | $5,080 |
| 90% | 270 | $7,560 | $6,760 |
The same lot, same fee, same build. The only difference is whether cars are in the bays. This is why “raise the fee” is a bad first answer to a half-empty lot: at 30% full, a fee increase is multiplying a small number.
Why the last $0.05 is not free
At $0.52, the same 20-bay lot would gross $6,510 and net $5,710 if every car still came. But $0.52 is above the reported safe rate for 50% Carbrainess, which is $0.47. Some drivers will turn around at the entrance, and every turn-away costs the full $31 charge that car would have paid.
There is no way to know the exact turn-away count from the outside. That is why the calculator shows the fee ladder and the safe rate instead of a single “best” number. Raise the fee one step, watch the entrance, and keep the change only if the queue does not thin.
Cut the build before cutting the fee
The cheapest lot is not the one with the fewest bays; it is the one with no wasted paving and no barrier you do not use. A second entrance costs $300 and $400 a day. If the plot only needs one, that is $400 a day of pure loss.