GameToolForgeOxygen Not Included
Planner · U59 build

Build Cost Planner: Metal, Rock and Tiles Before You Dig

A build order is also a material order. Add the machines and the planner totals the construction mass by material, so the delivery does not stall halfway.

No save uploadFree, in the browser
A base under construction with machines and ladders
Inputs

What are you building?

Electrolyzer200 kg metal ore
1
Gas Pump50 kg metal ore
3
Hydrogen Generator800 kg raw metal
1
Steam Turbine800 kg refined metal + 4 gasket
1
Thermo Aquatuner1200 kg metal ore
1
Building to add

Construction mass only. Pipes, wires, tiles, doors and ladders are separate; the tile count is the floor space the buildings occupy.

7 buildings need 3150 kg of construction material.

The same list occupies 47 tiles, draws 2040 W, generates 1650 W and adds 3.3 kDTU/s while active.

Total mass3.2 tconstruction only
Buildings7in this plan
Floor space47 tilesbuilding footprints
Heat3.3 kDTU/swhen all run

By material

Metal ore1.6 ttotal
Raw metal800 kgtotal
Refined metal + 4 gasket800 kgtotal

Line items

BuildingCountMassMaterial
Electrolyzer1200 kgMetal ore
Gas Pump3150 kgMetal ore
Hydrogen Generator1800 kgRaw metal
Steam Turbine1800 kgRefined metal + 4 gasket
Thermo Aquatuner11.2 tMetal ore
Order the material before the build
A build that stalls halfway is worse than a build that starts late. Put the refined metal and the raw metal in separate storage next to the site, and keep the construction material on the same side as the ladder.

What counts as construction mass

Every building has a construction mass and a material category. A Thermo Aquatuner needs 1,200 kg of metal ore; a Steam Turbine needs 800 kg of refined metal plus 4 gaskets. The total is the delivery bill, not the refined cost of the ore.

Why refined metal is different

Refined metal is a product, not a raw ore. A build that needs 800 kg of refined metal needs a Metal Refinery, a source of ore and a cooling loop before the first delivery. Raw metal ore can be dug and carried directly.

Tiles and pipes are separate

The planner counts the building footprints, not the walls, floors, ladders, pipes and wires. Add roughly one tile block per building edge plus the room walls; the exact number depends on the layout.

Dig oreraw metal or rockRefinerefinery + coolantDeliverstorage near the siteBuild100 kg per tile block
A build is a material order: raw ore, refined metal, delivery and construction.

Construction mass is not the whole bill

The planner totals the construction mass of the buildings you select: a Steam Turbine is 800 kg of refined metal plus four gaskets, an Aquatuner is 1,200 kg of metal ore, a Gas Pump is 50 kg. It does not include the pipes, wires, tiles, doors, ladders or the storage for the materials.

The tile count is the floor space the buildings occupy, not the total room area. A 5×3 Steam Turbine uses 15 tiles; the room around it still needs walls, a corridor and access. Use the mass for the delivery and the tile count for the floor plan, then add the infrastructure separately.

  • Turbine: 800 kg + 4 gaskets
  • Aquatuner: 1,200 kg
  • Gas Pump: 50 kg
  • Mass ≠ total build
Questions

Common questions about this tool

How much metal does an Electrolyzer need?

200 kg of metal ore. A Gas Pump needs 50 kg, a Liquid Pump 400 kg, and a Hydrogen Generator 800 kg of raw metal.

How much refined metal does a Steam Turbine need?

800 kg of refined metal plus 4 gaskets. A Blastshot Maker needs 800 kg of refined metal.

Why are tiles not in the list?

Tiles are built per cell, not as a single building. The planner reports the tiles the selected buildings occupy; add the room walls and floor separately.

Does construction material change the stats?

Yes for overheat temperature, decor and some thermal properties. The planner totals mass, not the material-specific bonuses; check the building tooltip for those.

What is the heaviest building in the list?

The Thermo Aquatuner at 1,200 kg of metal ore. The Steam Turbine and Blastshot Maker each need 800 kg of refined metal.